← Treksup

Alta Via 1 vs Alta Via 2: distance, climbing, cables and booking compared

Alta Via 1 is the shorter, lower and gentler of the two: in the Treksup app, 11 stages and 6,530 m of climbing, with two short protected passages and one knife-edge ridge. Alta Via 2 is 13 stages and 11,683 m, with equipped ground on nine of them and a high pass on equipped rock. Both book rifugio by rifugio, and on Alta Via 1 the first huts open their 2027 bookings on 1 and 2 November 2026.

The two side by side

Alta Via 1Alta Via 2
Start and finishLago di Braies to the La Pissa bus stop above BellunoBressanone to Feltre
Stages1113
Distance117 km158 km
Climbing6,530 m11,683 m
Highest point2,717 m, Lagazuoi2,952 m, on the Sella (day 5)
Biggest climb in a day994 m, Fanes to Lagazuoi1,899 m, Bressanone to the Città di Bressanone hut
Italian gradeEEAEE
Grade in the apphardvery hard
Equipped groundtwo short protected passages and the Forcella de Zita ridgeon nine of the thirteen stages
Seasonrifugi open about the third week of June, closing from mid-Septemberend of June to end of September
Half board, 2026€60 to €80€60 to €82

Figures are the app’s lines: Alta Via 1 on the trail authorities’ own geometry in Veneto and South Tyrol, Alta Via 2 assembled from OpenStreetMap. Elevation on both comes from a terrain model, so treat the climbing as close rather than exact. Both lines are shorter than the routes’ published totals: the app’s measurement notes put Alta Via 2 at 158.5 km against a canonical 180 km, and Alta Via 1 here stops at the La Pissa bus stop rather than in Belluno.

Cables, ladders and via ferrata

Alta Via 1

Alta Via 2

Booking the rifugi

Neither route has a central booking platform. The Italian Alpine Club’s portal, CAI Prenota Rifugi, covers the club-run huts only. Treksup is not a hut operator: you book each rifugio yourself.

Alta Via 1: dates are out

RifugioWhat its own site says
Vazzolernight 72027 bookings open online on 1 November 2026 at 12:00, moved from 5 October.
Carestiatonight 82027 bookings open on 2 November 2026, online only.
Nuvolaunight 42027 bookings on its website from January 2027. Planned season 20 June to 20 September 2027.
Lagazuoinight 3Books online with a credit card. 50% of the total is kept as a deposit and is never refunded; cancel within 3 days of arrival or do not show, and the whole amount is charged.
Coldainight 6Closed since 27 September 2026, back in June 2027 (read on 12 October 2026).

The app names Lagazuoi, Nuvolau, Coldai and Pian de Fontana as the ones that fill first. Deposits are common: the Dolomiti Belluno tourist board gives €20 a person at Rifugio Tissi, kept and not refunded.

Alta Via 2: no 2027 dates yet

RifugioWhat its own site says
Pueznight 3Books on its own booking site. Because of a water shortage, water is sold in bottles only.
Pisciadùnight 4Books on its own booking site. The 2026 summer season closed on 4 October.
Rosettanight 8A request form or the phone, with a different number in and out of season. Summer 2026 ran from 20 June to 27 September (the page also says 28).
Pradidalion day 9By phone or email. Half board in 2026: €65 for CAI members, €82 for others. Season mid-June to end of September 2026.
Bivacco Feltreon day 11Unstaffed and cannot be booked at all, says the app.

The app names Pisciadù, Rosetta, Pradidali and Mulaz as the ones that fill first: Rosetta and Pradidali sit in the Pale di San Martino, where day walkers arrive by cable car. None of the Alta Via 2 rifugi we read had published a 2027 booking date on 20 October 2026, and the Mulaz site did not answer.

Season

For Alta Via 1 the app gives the third week of June to mid-September, and the huts confirm the edges: Nuvolau plans 20 June to 20 September 2027, and Coldai closed on 27 September 2026. For Alta Via 2 the route authority gives the end of June to the end of September; on the Passo delle Farangole old snow lies longer than anywhere else on the route. On both, afternoon thunderstorms are normal in high summer. For Alta Via 1 the app says to start early and not to start a protected section if cloud is building before noon; for Alta Via 2, to ask the guardian about the day’s equipped section before you leave.

Getting there and back

Which one for whom

Pick Alta Via 1 for your first hut trek in the Dolomites: about half the climbing of Alta Via 2, buses at both ends, and one ridge, on day 10, that you cannot leave out. Book in November and January, not when your dates happen to be fixed.

Pick Alta Via 2 once you have done Alta Via 1 or another hut week; the app’s training advice says exactly that. You need to be steady on equipped rock, able to navigate a bare plateau in cloud, and ready for thirteen days and over 11,000 m of climbing with no rest day. The southern stages are the emptiest on the route, and help is further away there.

Both routes in Treksup

Alta Via 1 and Alta Via 2 are paid routes in Treksup: every stage, water, where to sleep and how each rifugio books come with the paid tier. Their safety briefs, trail conditions, alerts and weather are free, as on every route. 7 routes are open in full for free.

Get Treksup on the App Store

Questions

Is Alta Via 2 harder than Alta Via 1?

Yes. In the Treksup app Alta Via 2 has 13 stages against 11, 11,683 m of climbing against 6,530 m, and equipped ground on nine stages, including the Passo delle Farangole at 2,932 m on equipped rock. Alta Via 1 has two short protected passages and one knife-edge ridge.

Do I need a via ferrata kit for Alta Via 1 or Alta Via 2?

Not on the main lines, according to the app. On Alta Via 1 the app recommends one only for the Ra Gusela variant below Nuvolau. On Alta Via 2 the equipped sections need no set, but the Tridentina via ferrata next to the Pisciadù path does.

When do the Alta Via 1 rifugi open bookings for 2027?

Rifugio Vazzoler on 1 November 2026 at 12:00, Rifugio Carestiato on 2 November 2026 (online only), and Rifugio Nuvolau from January 2027, according to their own sites on 20 October 2026.

Does Treksup book the rifugi?

No. Treksup is not a hut operator, takes no commission and holds no beds. You book each rifugio yourself.

Read next

Sources

Huts publish their dates late and change them, as Vazzoler did this year. Check each rifugio’s own site before you plan around a date. Treksup is not a hut operator and books nothing. Page written 19 October 2026, rifugi read 20 October 2026.